|
|

(Last 10 Years) |
| |
Name Of Project |
Engineer/Owner |
Project |
| |
McCandless Twp. Sanitary Authority |
Chester Engineers, Inc. |
3 Rivers Wet Weather
Project; Install approx 4100’ of 8”- 12” pipe bursting, rip-rap installation; service sewer reconnections, concrete encasement & restoration. |
| |
City of Cameron, WV |
Lennon, Smith & Souleret |
Install 6”-14” sanitary sewers & appurtenances, grinder pump station installations, roadway bores, pavement & lawn restoration. |
| |
Scott Township |
Lennon, Smith & Souleret |
Replacement of approx 500’ of Existing VCP sanitary sewer With 18” HDPE |
| |
Dept. of General Services Bethel Park Flood Control |
Dept. of Environmental Protection |
Install 2600’ of 5 & 6 ft. precast concrete box culvert, construction of approx. 400’ of poured in place concrete box culvert, maint. & protection of traffic grouted rip-rap channel, stream dewatering & diversion, erosion & sedimentation controls, existing utility relocations & maint., pre-cast inlets & manhole installation, pavement & lawn restoration. |
| |
Moon Twp. Municipal Authority |
Nichols & Slagle Engineering |
Install approx 1100’ of 12” ductile iron water main w/ appurtenances including valves, restrained joint pipe, fire hydrant connection to existing mains & asphalt pavement restoration. |
| |
Steel
Valley Council of Governments |
City of Clairton |
In trench replacement of approx 900’ of 12” & 10” sanitary sewer 16-25’ deep including demolition & replacement of existing manholes, traffic control & asphalt pavement replacement. |
| |
The Canonsburg-Houston Joint Authority |
Killam Associates |
Canonsburg Wastewater Expansion Facilities Project. Install approx. 6800’ of new 42”-24” sanitary sewers & appurtenances, 273’ of 60” bore, siphon chamber & crossing, chemical grouting of existing sanitary lines, rip-rap stream protection, connections to existing mains,
pavement & lawn restoration.| |
Morgantown Utility Board |
Burgess & Niple, Ltd. |
Cheat Lake Sanitary Sewer; Install approx 42,000 ft of 2”- 30” sanitary sewers & appurtenances, force main installation, approx 1200’ of steel casing pipe bored & open-cut, demolition of 9 wastewater treatment plants & 4 sanitary lift stations, 1300’ installation of 12” HDPE buried river crossing, sanitary lift station, pavement & lawn restoration. |
| |
City of Wellsville, OH |
Gills, Guard & Johnson, Inc. |
Russell Heights Sanitary Sewer Improvement-Village of Wellsville, OH; Install sanitary Sewers consisting of open-cut Sewers & pipe bursting. |
| |
R.I.D.C. of
Southwestern Pennsylvania |
Mackin Engineering, Inc. |
Scope of work included site development of approx 14,000 Cu yds of excavation & grading, 5 acres of clearing & grubbing, approx 12,000 sq yds of roadway/parking lot paving w/ asphalt curbing & under drains, installation of sidewalks & concrete drainage gutters, sanitary storm sewer systems, main line feed & hydrant, const. of a versa-wall retaining wall system, building & maintaining erosion & sedimentation controls, survey & layout. |
| |
Fox Chapel Water Authority |
Bankson Engineers, Inc. |
Install approx 15,132’ of 16”, 12” & 8” restrained & unrestrained ductile iron water main in & along a high traffic roadway, 26 one inch service line taps, 28 reconnections to existing mains, 4 stream crossings, traffic control & maintenance & approx. 5,500 sq yds of paving restoration. |
| |
Moon Township Municipal Authority |
Nichols & Slagle Engineering |
Ewing Road Waterline Replacement Project; Install approx. 3,830’ of 12” & 8” restrained & unrestrained ductile iron waterline, reconnection & installation of new services, air/vacuum release manholes, fire hydrants, asphalt paving, concrete paving & general restoration. |
| |
Pennsylvania Turnpike Commission |
Pennsylvania Turnpike Commission |
Beaver Valley Expressway Passive Wetland Treatment; Project consisted of building a passive wetland treatment system for an existing acid mine drainage problem (AMD). excavation of ponds, lining them with a synthetic liner & installing a piping system. |
| |
Columbiana County Commissioners |
Columbiana County Commissioners |
Wellsville Water Transmission Repair Project; Replace & Install of 16” ductile iron pipe waterline, valves & appurtenances, clearing & grubbing, line stopping, connections to existing facilities, layout & survey, erosion & sedimentation controls as well as pavement & general restoration. |
| |
City of Wellsburg |
KLH Engineers, Inc. |
Waterline Replacement 12th Street; Replace 12” waterline w/ new 16” ductile iron waterline complete w/ valves, fire hydrants & appurtenances, clearing & grubbing, line stopping, connections to existing facilities, layout & survey, erosion & sedimentation controls, as well as pavement & general restoration. |
| |
Dept. of General Services |
Boyer Partnership |
Upgrade power plant & steam distribution systems, including installation of seamless carbon steel seam & condensate lines, modifications to existing steam vaults, insulation, testing coordination with power plant & operating facilities, asphalt & concrete pavement restoration. |
| |
Pennsylvania Turnpike Commission |
Trumbull Corp. Const. |
Mon/Fayette Expressway, Sect. 52, wetland replacement, work included mass excavation, fine grading, wetland plantings, gabion wall construction, dtream protection, erosion control, surveying & layout, rip-rap placement, and final restoration. |
| |
South Strabane Twp. |
Killam Associates, DLA |
Manifold Pump Station Replacement project consisted of replacing an existing & functioning sanitary lift station with a larger lift station. Work included excavation, backfilling, setting of new concrete sanitary wet & dry well, mech. Piping, thermal & moisture protection, installation of chemical feet systems, telemetry, flowmeter, painting, cyclone fencing, coordination with existing facilities & general site restoration. |
| |
Beaver County Corp. Development |
Michael Baker, Jr. Inc. |
Phase 2 Roadway Infrastructure Development. Work included clearing & grubbing, survey & layout controls, installation of all sanitary sewers, waterlines, storm sewers, erosion & sedimentation controls, mass excavation, fine grading asphalt road const., installation of a sanitary pump station complete with all elect. Controls & standby generator, force main installation, gabion wall installation & general site restoration. |
| |
Commonwealth of Pennsylvania |
Commonwealth of Pennsylvania |
Construction of a wetland including clearing & grubbing, excavation & fill, rip-rap channels & seeding. |
| |
Indian Creek Water Authority |
Bankson Engineers, Inc. |
Installation of approx. 16,680 feet of 8” C-90 water main, 6,145 ft. of 6” C-900 water main, 2,910 ft. of 2” PVC water main, one 250 ft. 16” turnpike bore, fire hydrants, flushing hydrants, air/vacuum valves, asphalt pavement replacement & other related waterline appurtenances. |
| |
The Municipal Authority of the Borough of West View |
Bankson Engineers, Inc. |
Installation of approx. 13,330 feet of 36” restrained & non-restrained ductile iron water transmission main & appurtenances, 36” butterfly valves, concrete encasement, 220’ of 48” dia. Steel casing highway bore, pavement replacement, traffic control & restoration. |
| |
Industrial Project References Available Upon Request | |
|