  McCandless Twp. Sanitary Authority Chester Engineers, Inc. 3 Rivers Wet Weather Project; Install approx 4100’ of 8”- 12” pipe bursting, rip-rap installation; service sewer reconnections, concrete encasement & restoration.
  City of Cameron, WV Lennon, Smith & Souleret Install 6”-14” sanitary sewers & appurtenances, grinder pump station installations, roadway bores, pavement & lawn restoration.
  Scott Township Lennon, Smith & Souleret Replacement of approx 500’ of Existing VCP sanitary sewer With 18” HDPE
  Dept. of General Services Bethel Park Flood Control Dept. of Environmental Protection Install 2600’ of 5 & 6 ft. precast concrete box culvert, construction of approx. 400’ of poured in place concrete box culvert, maint. & protection of traffic grouted rip-rap channel, stream dewatering & diversion, erosion & sedimentation controls, existing utility relocations & maint., pre-cast inlets & manhole installation, pavement & lawn restoration.
  Moon Twp. Municipal Authority Nichols & Slagle Engineering Install approx 1100’ of 12” ductile iron water main w/ appurtenances including valves, restrained joint pipe, fire hydrant connection to existing mains & asphalt pavement restoration.
  Steel Valley Council of Governments City of Clairton In trench replacement of approx 900’ of 12” & 10” sanitary sewer 16-25’ deep including demolition & replacement of existing manholes, traffic control & asphalt pavement replacement.
  The Canonsburg-Houston Joint Authority Killam Associates Canonsburg Wastewater Expansion Facilities Project. Install approx. 6800’ of new 42”-24” sanitary sewers & appurtenances, 273’ of 60” bore, siphon chamber & crossing, chemical grouting of existing sanitary lines, rip-rap stream protection, connections to existing mains, pavement & lawn restoration.
  Morgantown Utility Board Burgess & Niple, Ltd. Cheat Lake Sanitary Sewer; Install approx 42,000 ft of 2”- 30” sanitary sewers & appurtenances, force main installation, approx 1200’ of steel casing pipe bored & open-cut, demolition of 9 wastewater treatment plants & 4 sanitary lift stations, 1300’ installation of 12” HDPE buried river crossing, sanitary lift station, pavement & lawn restoration.
  City of Wellsville, OH Gills, Guard & Johnson, Inc. Russell Heights Sanitary Sewer Improvement-Village of Wellsville, OH; Install sanitary Sewers consisting of open-cut Sewers & pipe bursting.
  R.I.D.C. of Southwestern Pennsylvania Mackin Engineering, Inc. Scope of work included site development of approx 14,000 Cu yds of excavation & grading, 5 acres of clearing & grubbing, approx 12,000 sq yds of roadway/parking lot paving w/ asphalt curbing & under drains, installation of sidewalks & concrete drainage gutters, sanitary storm sewer systems, main line feed & hydrant, const. of a versa-wall retaining wall system, building & maintaining erosion & sedimentation controls, survey & layout.
  Fox Chapel Water Authority Bankson Engineers, Inc. Install approx 15,132’ of 16”, 12” & 8” restrained & unrestrained ductile iron water main in & along a high traffic roadway, 26 one inch service line taps, 28 reconnections to existing mains, 4 stream crossings, traffic control & maintenance & approx. 5,500 sq yds of paving restoration.
  Moon Township Municipal Authority Nichols & Slagle Engineering Ewing Road Waterline Replacement Project; Install approx. 3,830’ of 12” & 8” restrained & unrestrained ductile iron waterline, reconnection & installation of new services, air/vacuum release manholes, fire hydrants, asphalt paving, concrete paving & general restoration.
  Pennsylvania Turnpike Commission Pennsylvania Turnpike Commission Beaver Valley Expressway Passive Wetland Treatment; Project consisted of building a passive wetland treatment system for an existing acid mine drainage problem (AMD). excavation of ponds, lining them with a synthetic liner & installing a piping system.
  Columbiana County Commissioners Columbiana County Commissioners Wellsville Water Transmission Repair Project; Replace & Install of 16” ductile iron pipe waterline, valves & appurtenances, clearing & grubbing, line stopping, connections to existing facilities, layout & survey, erosion & sedimentation controls as well as pavement & general restoration.
  City of Wellsburg KLH Engineers, Inc. Waterline Replacement 12th Street; Replace 12” waterline w/ new 16” ductile iron waterline complete w/ valves, fire hydrants & appurtenances, clearing & grubbing, line stopping, connections to existing facilities, layout & survey, erosion & sedimentation controls, as well as pavement & general restoration.
  Dept. of General Services Boyer Partnership Upgrade power plant & steam distribution systems, including installation of seamless carbon steel seam & condensate lines, modifications to existing steam vaults, insulation, testing coordination with power plant & operating facilities, asphalt & concrete pavement restoration.
  Pennsylvania Turnpike Commission Trumbull Corp. Const. Mon/Fayette Expressway, Sect. 52, wetland replacement, work included mass excavation, fine grading, wetland plantings, gabion wall construction, dtream protection, erosion control, surveying & layout, rip-rap placement, and final restoration.
  South Strabane Twp. Killam Associates, DLA Manifold Pump Station Replacement project consisted of replacing an existing & functioning sanitary lift station with a larger lift station. Work included excavation, backfilling, setting of new concrete sanitary wet & dry well, mech. Piping, thermal & moisture protection, installation of chemical feet systems, telemetry, flowmeter, painting, cyclone fencing, coordination with existing facilities & general site restoration.
  Beaver County Corp. Development Michael Baker, Jr. Inc. Phase 2 Roadway Infrastructure Development. Work included clearing & grubbing, survey & layout controls, installation of all sanitary sewers, waterlines, storm sewers, erosion & sedimentation controls, mass excavation, fine grading asphalt road const., installation of a sanitary pump station complete with all elect. Controls & standby generator, force main installation, gabion wall installation & general site restoration.
  Commonwealth of Pennsylvania Commonwealth of Pennsylvania Construction of a wetland including clearing & grubbing, excavation & fill, rip-rap channels & seeding.
  Indian Creek Water Authority Bankson Engineers, Inc. Installation of approx. 16,680 feet of 8” C-90 water main, 6,145 ft. of 6” C-900 water main, 2,910 ft. of 2” PVC water main, one 250 ft. 16” turnpike bore, fire hydrants, flushing hydrants, air/vacuum valves, asphalt pavement replacement & other related waterline appurtenances.
  The Municipal Authority of the Borough of West View Bankson Engineers, Inc. Installation of approx. 13,330 feet of 36” restrained & non-restrained ductile iron water transmission main & appurtenances, 36” butterfly valves, concrete encasement, 220’ of 48” dia. Steel casing highway bore, pavement replacement, traffic control & restoration.
 