Completed Projects
| Name Of Project / Owner |
Project Description |
| Large Pennsylvania Gas Company |
Various Gas Line Projects |
| Large West Virginia Gas Company |
Various Gas Line Projects |
| Emcor Energy Services, Inc. |
Imperial Gas Gathering Pipeline |
| Top |
| Name Of Project / Owner |
Project Description |
| Chemical Manufacturing Facility |
Provide complete Industrial Service. Various projects include mechanical piping, excavation, demolition, concrete & asphalt pavement, structural steel erection & fabrication, underground piping, vacuum truck work, waterblasting, hauling, snow removal & general maintenance. |
| Coal Fired Electric Power Plant |
Provide complete Industrial Services. Various projects include mechanical piping, excavation, demolition, concrete & asphalt pavement, structural steel erection & fabrication, underground piping, vacuum truck work, waterblasting, hauling, snow removal & general maintenance. We haul and landfill all of the A.E.S. flyash & gypsum. |
| Latex Manufacturing Facility |
Provide complete Industrial Services. Projects includes mechanical piping, excavation, demolition, concrete & asphalt pavement, structural steel & fabrication, underground piping, vacuum truck work, hauling, waterblasting, snow removal & general maintenance. |
| Top |
| Name Of Project / Owner |
Engineer |
Project Description |
Major Energy/Coal Company
 Click Here For Our Photo Album On This Project
|
D’Appolonia |
Construction of 18,707 ft of access road and right-of-way for a future coal conveyor system. Includes the excavation of roughly 1.2 million cubic yards of excavation and 35,495 sy of access road. |
Northfield Cargo Facility
Allegheny County Airport Authority |
P.B.S.J. |
Construction of a 100 acre future cargo facility site near the Pittsburgh International Airport. Includes excavation of 1.35 million cubic yards of excavation, 20,000 sy of asphalt paving and all site utilities. |
Wal-Mart Store #1948-01
Cleveland Construction |
Atwell-Hicks, LLC |
Site preparation and underground utilities for new Wal-Mart Supercenter in Weirton, WV |
Alta Vista Business Park Phase II Site Grading
The Monongahela Industrial Development
|
H.F. Lenz Company |
Excavation & grading 1,700,000 c.y.; Erosion control plan including 4 sediment ponds; Storm sewer installation, seeding & mulching |
Southpointe Industrial Park
Washington County Authority |
L. Roberty Kimball & Associates |
30,000 sy of new asphalt road, 180,000 CY of excavation and fill, 10,600’ of 15” to 60” concrete and HDPE storm piping and appurtenances, 8,300’ of 6” to 18” PVC sanitary sewer and appurtenances, 17,600’ of 4” to 6” utility conduits, 19,000’ of concrete curbing, 3000 SY of concrete sidewalks, as well as finish landscaping with drip irrigation. |
| Wal-Mart MDC #7030 |
|
Work consisted of the following: Excavation, fill & compaction of approx 1,000,000 cy of earth & rock; Drilling & GPS survey & layout of project site; Clearing & grubbing of approx 160 acres; Installation site utilities including approx. 22,000 feet of 48” through 12” storm drains, 35 manholes, 170 inlets & 95 headwalls & all associated appurtenances, 3,000 ft of 8” & 6” sanitary sewer, 1400 ft of 2” through 12” domestic water line, 11,000 ft of 6” through 12” ductile iron fire line w/ hydrants & appurtenances & water meter vault; Installation & maintenance of all erosion controls for the site including ditching, temporary seeding mulching, rip rap channels, sedimentation ponds, out protection, silt fence & check dams; Fine grading & aggregate sub-base approx. 300,000 sy for pavement on the site; Fine grading & placement of 3” of aggregate sub-base placement of approx 125,000 sy for the building structure floors; Cement stabilization of the site to accommodate winter work; Existing utility relocation & removal on the site; Provided full time & pre-qualified erosion & sedimentation as well as safety supervisor for the entire duration of the project. |
Arnold Palmer Regional Airport, Contract 81 Westmoreland
Westmoreland County Airport Authority |
Lee-Simpson Associates, Inc. |
3Construction of a runway expansion including mass excavation & controlled fills, clearing and grubbing, erosion and sedimentation controls and implementation, wetland mitigation and construction, installation of approximately 13,000 ft of storm pipe ranging from 6” to 36”, approx. 35,000 sy of runway paving including stone sub-base and asphalt paving, installation of all electrical systems for the runway expansion including all air field lighting, guidance signage, glide slope instrumentation, PAPI, REIL and MALSR Systems, seeding & mulching, safety coordination and implementation, site fencing as well as project surveying layout & control |
| Rockingham Technology Park |
Engineering Concepts, Inc. |
Site preparation approx 250,000 cy; construct new roadway 24,551 s.y. Install. Waterline, sanitary sewer & storm sewer; 221 ft of 12X12 double box culvert |
Mt. Crawford, VA
Wal-Mart Stores East |
H&M Engineers |
Work consisted of the following: Excavation, fill & compaction of approx. 1,300,000 c.u. of earth & rock; Drilling & shooting of approx. 300,000 c.u. of rock; GPS survey & layout of project site; Clearing & grubbing of approx. 166 acres; Installation site utilities including approx. 21,800 feet of 48” through 12” storm drains, 33 manholes, 171 inlets & 94 headwalls & all associated appurtenances, 3,500 ft of 8” & 6” sanitary sewer, 1,350 ft. of 2” through 12” domestic water line, 10,755 ft of 6” through 12” ductile iron fire line with hydrants & appurtenances & water meter vault; Installation & maintenance of all erosion & sedimentation controls for the site including ditching, temporary seeding & mulching, rip rap channels, sedimentation ponds, outlet protection , silt fence & check dams; Fine grading & aggregate sub-base placement of approx. 305,000 s.y. for pavement on the site; Fine grading & placement of 3” of aggregate sub-base placement of approx. 124,000 s.y. for the building structure floors; Cement stabilization of the site to accommodate winter work; Existing utility relocation & removal on the site; Provided full time & pre-qualified erosion & sedimentation as well as safety supervisor for the entire duration of the project. |
| Pennsylvania DEP |
Pennsylvania DEP |
Contract was generally for the installation of a steel soldier pile and concrete lagging retaining wall behind which was located behind an existing church to stabilize an unstable embankment. Work included excavation and haul off of excess soils, approximately 290 vertical feet of 36” caisson drilling, installation of approximately 731 vertical feet of steel piles, 200 feet of steel walers, pre-cast concrete lagging panels, 1080 linear feet of steel tie backs, 1000 square yards of rock face support system, HDPE mine acid drainage piping system, stabilization of underlying mine void by drilling and pumping of all erosion and sedimentation controls, seeding and mulching, as well as project layout and survey. |
| Top |
| Name Of Project / Owner |
Engineer |
Project Description |
Bellwood Sanitary Sewer Rehabilitation Project
Bellwood Municipal Authority
 Click Here For Our Photo Album On This Project
|
Morris & Knowles |
Pipe burst 16” HDPE into existing 12” 5,448 ft; Pipe burst 12” HDPE into existing 8” 2,399 ft; Pipe burst 8” HDPE into 8” 2,109 ft; Pipe burst existing 18” HDPE into existing 12” 1,240 ft; Relining existing sewer 41,384 ft; Replace 177 manholes; Reconnect 860 lateral; Complete restoration |
Mt. Lebanon-Washington Road Pipe Bursting
Municipality of Mt. Lebanon |
Gateway Engineers |
Pipe burst of 16” HDPE in 15” VCP (approx. 155 lf); Replace 1 manhole (approx 40 ft deep) |
Combined Sewer Overflow Elimination & Rehabilitation Project-Phase 1
Borough of Meyersdale
|
The EADS Group, Inc. |
8” Open-cut sewer 8274 lf; 12” open-cut sewer 5010 lf; 15” open-cut sewer 464 lf; 91 sanitary manholes; 6” sanitary lateral 5275 lf; 12” HDPE pipe burst through 10” 2652 lf; 12” HDPE pipe burst through 12” 1728 lf |
Sanitary Sewer Construction
Borough of Bridgeville |
Gateway Engineers |
8” pipe bursting 310 lf; 16” pipe bursting 482 lf; 12” pipe bursting 648 lf; 6 Service reconnects; 6 Sanitary manhole replacements |
Westmoremand Emergency Leak Repair
Westmoreland Water Authority |
|
Point repair of existing cast-iron water line in river; Slipline 1500 lf of 18” HDPE into existing water main; Tie into existing water |
Growing Greener-Oakland Avenue & Water Street Sanitary Sewer Replacement
Indiana Borough Authority |
Stiffler & McGraw |
Pipe burst 2342 lf of 8” HDPE; Clean & TV inspection1684 lf; 92 lf of 8” Open-cut sanitary sewer; 23 lf of 10” open-cut sanitary sewer; Replace 11 sanitary manholes; Reconnect 25 laterals |
Willet Road Sanitary Sewer Rehabilitation
Township of Shaler Municipal Authority |
KLH Engineers |
8” fold and form liner 2276 lf; 8” pipe bursting 2276 lf; Replace 18 sanitary manholes |
Kiwanisj Park Storm & Sanitary Sewer Rehabilitation
Township of Shaler Municipal Authority |
KLH Engineers |
8” Pipe bursting 1635 lf; 8” fold and form lining 1635 lf; 8” open-cut sewer 102 lf; Replace 11 manholes |
| Top |
| Name Of Project / Owner |
Engineer |
Project Description |
Mudlick Creek Interceptor
Western Virginia Water Authority
 Click Here For Our Photo Album On This Project
|
Olver, Inc. |
9,705 ft of 36” ductile iron sanitary sewer (0-21 ft deep); Installation of 78 sanitary manholes (48-96 ft in diameter); 260 ft of 54” bored steel casing; 5 interconnections to existing interceptor sewer; removal of 4,550 ft of existing sanitary sewer |
48” Ruffsdale Transmission Watermain (Ruffsdale Tank to Sony Logistics Center)
The Municipal Authority of Westmoreland County |
The EADS Group, Inc. |
Installation of 5,855 ft. of 48” water main and 225 ft. of 42” water main. Includes 9 Butterfly Valves and 4 Air Release Vaults |
Waste Water Treatment Regionalization Project Contracts 1 & 2
Saxonburg Area Authority
 Click Here For Our Photo Album On This Project
|
HRG Engineers,Inc. |
Installation of 268,640’ of 6” to 18” PVC gravity sewer, 23,350’ of 10” & 12” ductile force main, 3,380’ of 8” to 30” bored road crossings, 1275 concrete manholes, 82,600 feet of roadway pavement. |
Flaugherty Run Outfall Sewer & Forcemain Project
Moon Township Municipal Authority |
Nichols & Slagle Engineering, Inc. |
Installation of approx 6,700 lf of 30” O.D. outfall sewer, 10,000 lf of 14” and O.D. 16” forcemain, 2,100 lf of PVC and DIP sanitary sewer, and installation of individual service connections for existing residences. |
| Midway Sewerage Authority |
Gannett Fleming, Inc. |
Work included installing approximately 200,000 feet of gravity and force main sanitary sewer raning from 4” to 16” both PVC as well as ductile iron pipe, approximately 1012 pre-cast manholes, installation of 12 through 24” highway casings bored, asphalt pavement restoration, survey and layout. |
| Meyersdale Combined Sewer Overflow Elimination & Sewer Rehabilitation Project |
The EADS Group, Inc. |
Construction of approximately 13,748 ft. of 8” diameter, 12” diameter and 15” diameter sanitary sewer lines, manholes and appurtenances which will replace the existing combined sewer lines, manholes and appurtenances. Also included is the construction and connection of new 6” diameter sewer laterals from the new sewer mains to existing customer property lines, and restoration. Additionally the project includes the construction of approx. 705 of 12”, 15”, and 24” diameter storm sewers and appurtenances which will allow the existing combined sewers to be utilized. Approx 500 ft of 24” rock bores |
| Top |
|
|